February 5 2000
The past Friday February 4 at 16:20 hours one crane took the
structure of the second floor to being assembled on the part of structure that already had
been armed on the foundation of the building. In half and hour all the structure got fixed
concluding the heavy part of the arming of the prototype building. The following step will
be the fine adjustment of the structure and outer finished.
This information is so abundant and the number of images, that we have created a
special page Gallery with images and a brief description of the events (January
29, 2000).
INVEST IN THE FUTURE...
Last Update: Febrero 5, 2000. |